Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the all-in-one-wp-migration domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114
Blog Posts Archives - Page 2 of 2 - Amedeo Properties - Architectural Design
Servicing all Perth Suburbs
0413 445 766

Blog Posts

Blocked Sewer Pipe

An old ceramic sewer pipe become blocked due to tree roots entering the pipe. We dug out the pipe by hand as a retaining wall prevented us from bringing in the excavator. The blocked pipe was disconnected and removed. As can be seen the roots have entered the pipe and completely blocked the flow. The

Blocked Sewer Pipe Read More »

Pilbara Campsite Renovation

On this job we did a full over haul of an accommodation camp, consisting of 8 x four person Dongers plus an ablution block. In addition to this there were four sets of four free standing accommodation units with ensuites. We re-wired the Dongers making the entire camp safe with additional external lights. The Pilbara

Pilbara Campsite Renovation Read More »