On this job we did a full over haul of an accommodation camp, consisting of 8 x four person Dongers plus an ablution block. In addition to this there were four sets of four free standing accommodation units with ensuites. We re-wired the Dongers making the entire camp safe with additional external lights.
The Pilbara outback!
No challenge too great. We had the determination to arrive with impact, a clear direction and to complete the team project.
The dilapidated Dongers!
Dilapidated donger from the inside.
We prepped all walls, removed and replaced old insulation and cladding. The plumbing was all reinstated and the ceilings refitted flushed and insulated. All new light fittings and power points.
Cladding, floors, plumbing, power re-wire, insulation, AC full service, fully complete with quality paint. Certified electrical safety and full finish with Termite treatment and final service clean.
An external refit with new sheets, insulated and secure. Roof pluming all replaced well drained and secured.
Fresh new lawn planted, prepared nurtured and watered daily by proud local community employee team member. This gives the camp a nice feeling to commence an inspiring day and come home to a relaxing environment after hard day in the field.